Kubus Construction builds the cafés, restaurants, offices and retail spaces that open on schedule in Southern California — with hands-on project management from permits through final inspection.
We've structured every TI project the same way since day one — because the fastest way to blow an opening date is a phase you didn't plan for. Here's exactly how your project moves from signed contract to grand opening.
Site walk, needs assessment, and a line-item bid — not a back-of-napkin number. You see exactly where the money goes before you sign.
Plans, MEP coordination, and permit submittal through your local AHJ. We speak the language of every OC city planning department.
Daily site management, weekly owner reports, transparent change-order process. The jobsite stays clean. The schedule stays honest.
We sweat the final inspection so you don't. Punch list closed, COO secured, you flip the Open sign on the date we promised.
Every project starts vacant or stripped to concrete. We turn it into a fully inspected, occupancy-ready commercial space — coordinating trades, timelines, landlords, and city officials so you only have to answer the questions that actually require you.
Espresso bar rough-ins, grease interceptors, Type II hoods, health department walk-throughs, and the bar-top finish your brand deserves — handled start to finish.
Full kitchen build-outs, Type I hood systems, FRP, quarry tile, grease lines, and dining-room finishes. Code-compliant, inspector-ready, and delivered on your soft-opening date.
Private offices, open floor plans, conference rooms, glass walls, and IT infrastructure.
Storefronts, fixtures, finishes, fitting rooms, and brand-aligned design execution.
One team, one contract — from schematic sketch through final certificate of occupancy.
Converting raw shells and prior-use spaces into your occupancy-ready footprint. Permits, MEP, finishes, and inspections all managed in one tight schedule.
We carry your plans through the city — from plan check corrections to the final sign-off walk. Your opening date doesn't slip because of a paperwork snag.
Most TI projects go sideways long before a shovel hits dirt. We invest hours with you — and with the architect, the MEP engineer, and the city — so that the numbers on page one match the numbers at final walk. That's how we keep openings on schedule and owners out of surprises.
From 800-sq-ft coffee shops to full-service restaurants and multi-tenant office suites, these are the project categories we specialize in — each with its own code path, inspection rhythm, and finish standard.
We're not a volume shop. We take on a deliberate number of projects per quarter so every client gets the project management they're paying for — and so no one learns at month three that their GC is distracted.
Schedules built backwards from your opening date, with buffer for real-world permit timelines.
We don't pass inspection by luck. Plans, rough-ins, and finishes are pre-walked before every call.
One PM from estimate to handoff. No sub-shuffle, no finger-pointing, no "that's not my scope."
Transparent change-order process. If something moves, you see the number before it moves.
Commercial build-outs are stressful. The measure of a good contractor isn't whether problems come up — it's how fast they get solved and whether the owner's opening date still holds. Here's what our clients have said.
"Kubus ran our café build-out from permit to opening. Every inspection passed on the first walk. They gave us the opening date and they hit it — that's all we could ask for."
"Clean jobsite, consistent communication, and honest numbers. After dealing with two other contractors on prior locations, Kubus is the one we call now."
"Office TI delivered on time, on budget, and with the finish quality we specced. Plan-check corrections handled without us even being looped in. Highly recommended."
Tell us about the space, the use type, and your target opening date. We'll respond within 24 hours with next-step options — usually a site walk within the week.